Criteo Boston Installation

Here are some pictures from our recent installation at Criteo’s Boston offices. This is from the 14th floor installation, completed in June of 2015. Elements include products from the Teknion Leverage and Expansion line as well as other ancillary manufacturers. The Criteo 15th floor is in the design phase now with an expected completion by the end of 2015.

IMG_4046
IMG_4057 IMG_4061 IMG_4063 IMG_4065
IMG_4052
IMG_4055
IMG_4042